Reconstruction of geometric improvement of Exiting intermediate lane to 2 lane with paved shoulder configuration from KM 1.957 to KM 28.6 Excluding Narender Bypass (KM 13.8 to KM 18.55) of NH-94 in the state of Uttarakhand with Engineering, Procurement & Construction (EPC) Mode, Agrakhal, Tehri Garwal, Uttarakhand with M/s M. G. Contractors Private Limited.

Copyrights © 2026 All Rights Reserved by Pronomina Engineers Pvt. Ltd.