Rectification of Accidental Black Spot of Km106.400 NH-72(New NO-07) In the state of Uttarakhand
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Upto 3 m depth
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc.
Dense Graded Bituminous Macadam.
Bituminous Concrete
Interlocking Concrete Block Pavement.
Fitting of Retro- reflectorized Traffic signs & crush barrier.